News


December

61 Tippers were delivered to Turkmen Oil and Gas Construction.

 

A big thanks to our Transport Partner "Gebrüder Weiss"!

Ms. Mia Saenger (Project Assistant) and Mr. Wadim Monosov (After Sales Assistant) succesfully passed their Trial period and we are glad to have both as an integral part in our team.


October

ITS signed a contract for delivery of all ground service equipment for the new airports Dashgouz and Turkmenabad in Turkmenistan.


May

8 trucks delivered to the airport Ashgabad (partial delivery).

Turkmen Oil and Gas Construction has ordered 61 MAN TGS WW off-road vehicles – its first MAN trucks order:

Efford in exteme heat: MAN-TGS build streets for oil- and gasproduction:


April

Mr. Henry Keil left our company on April 30st 2014.


January

61 Tipper trucks for Turkmen Gas and Oil Construction

The TGS WW heavy-duty tippers will be equipped for extreme heat, as summer temperatures in Turkmenistan can reach 60 degs C.

All of the trucks will have the 360bhp engine and will be plated at 33 tonnes gvw. All are also 6x6 all-wheel drive vehicles, suitable for heavy-duty tractor work.

They will be used in road construction work to enable access to oil and gas reserves in the west of Turkmenistan.